EZ BH Projects delivers this service with meticulous attention to detail, a dedicated project manager, and full budget transparency throughout.
Service Overview
| Detail | Information |
|---|---|
| Typical Timeline | 12–36 months depending on scope |
| Typical Investment | $2M – $15M+ |
| Service Area | Miami Beach, Surfside, Bay Harbor Islands, Bal Harbour & surrounding areas |
| Warranty | 1-year full workmanship warranty |
Independent Advocacy for Luxury Construction in Miami
An owner's representative is the single most effective risk-management tool available to a luxury homeowner undertaking a construction project above $3 million. EZ BH Projects provides owner's representative services for estate-class residential and high-end commercial projects across Miami-Dade and Broward counties — bringing fifteen years of South Florida construction expertise to bear exclusively on behalf of the homeowner, with no financial interest in the construction contract and no relationship to the general contractor.
We serve as your expert at the table: the person who reads every pay application with the eye of someone who has built what your GC is claiming to have built, who reviews every change-order proposal with current knowledge of what that work actually costs in the Miami subcontractor market, and who monitors the schedule with the understanding of what slippage in one phase costs in every phase that follows.
What an Owner's Representative Is — and Is Not
Owner's Representative
An owner's representative (also called an owner's rep or project manager) is retained directly by and exclusively for the owner. The owner's rep has no contract with the general contractor, no subcontractors on the project, and no financial incentive tied to the construction outcome other than a fee paid by the owner. The owner's rep's sole obligation is fiduciary: to protect the owner's time, money, and project vision against the natural information asymmetry that exists between a sophisticated construction firm and a homeowner who is not a construction professional.
General Contractor
The general contractor is contracted to build the project. The GC's financial interests — maximizing margin on self-performed work, minimizing warranty claims, managing the cost and schedule risk they have accepted — are structurally different from the owner's interests. This is not a criticism of GCs; it is a description of how construction contracts work. An owner's rep does not replace the GC. The owner's rep ensures the owner has an independent expert who can evaluate the GC's representations.
Construction Manager at Risk
A construction manager at risk (CMR) is a hybrid: they provide preconstruction advisory services and then take on construction risk similar to a GC, typically under a Guaranteed Maximum Price contract. The CMR's fiduciary duty shifts once they hold the construction contract. EZ BH Projects is distinct from a CMR in our owner's rep role because we never hold a construction contract on the projects where we serve as owner's representative — our loyalty cannot be divided.
When You Need an Owner's Representative
Certain project characteristics reliably predict that an owner's representative will deliver a return on their fee in cost savings and schedule protection alone:
- Project budget above $3–5 million — The financial complexity of a large construction contract creates information asymmetries that only independent expertise can close. Our fee is typically recovered on the first substantive change-order negotiation.
- Absentee or internationally mobile owner — Homeowners who cannot be present in Miami during construction need a trusted, expert presence on the ground — someone who will visit the site, attend OAC meetings, and escalate issues before they become crises.
- First-time luxury builder — Homeowners who have not built at the estate level before lack the baseline to evaluate whether claims about cost, schedule, and scope are reasonable. An experienced owner's rep provides that baseline immediately.
- Multi-stakeholder projects — Estates involving family trusts, multiple principals, or institutional ownership benefit from a single, expert decision-making coordinator who can synthesize technical information for non-technical stakeholders.
- Projects with complex design teams — When an internationally recognized architecture firm, multiple specialty designers, and a large GC are all operating simultaneously, an owner's rep coordinates across these parties and ensures the owner's program is preserved as each discipline makes decisions.
- Projects with prior problems — If a project has experienced budget overruns, schedule slippage, or quality failures and the owner needs independent verification of the GC's recovery plan, an owner's rep can step in mid-construction.
Our Owner's Rep Deliverables
Preconstruction
- Design review for constructability and scope completeness before bid issuance
- Bid package preparation and issuance to a pre-vetted list of qualified Miami-Dade GCs
- Bid leveling — comparing proposals on an apples-to-apples basis, identifying exclusions, qualifications, and below-market line items that signal future change orders
- GMP negotiation — using current market data to challenge rates, margins, and general conditions costs
- Contract review — flagging risk-shifting provisions, change-order clause structure, and warranty limitations before execution
Construction Phase
- Regular site visits and field observation reports
- Monthly pay-application review — verifying stored materials, percentage complete claims, and lien waiver compliance before recommending payment
- Change-order audit — independently pricing every change-order proposal before owner approval
- Schedule monitoring — maintaining a baseline schedule and measuring actual progress against it weekly
- OAC (Owner-Architect-Contractor) meeting facilitation and minutes
- Issue log management — tracking open items, responsible parties, and resolution deadlines
Closeout
- Substantial completion inspection and punchlist generation
- Punchlist completion tracking and GC accountability
- Certificate of occupancy coordination
- Warranty documentation compilation and owner handoff package
- Final accounting reconciliation — confirming all approved changes are accurately reflected in final contract value
Fiduciary Comparison — GC vs. CM-at-Risk vs. Owner's Representative
| Factor | General Contractor | CM-at-Risk | Owner's Representative |
|---|---|---|---|
| Fiduciary duty to owner | No — contractual counterparty | Partial — advisory pre-GMP, counterparty post-GMP | Yes — exclusive fiduciary throughout |
| Fee structure | Overhead + profit on construction | Preconstruction fee + construction margin | % of construction or fixed fee, paid by owner |
| Controls subcontractors | Yes | Yes (post-GMP) | No — oversight only |
| Owns schedule risk | Yes (under contract) | Yes (post-GMP) | No — monitors and advocates |
| Owns budget risk | Yes (within contract scope) | Yes (within GMP) | No — audits and protects |
| Transparency on costs | Limited — margin is proprietary | Open book pre-GMP, limited post-GMP | Full transparency — no margin to protect |
Engagement Models and Fee Structures
EZ BH Projects offers three owner's representative engagement structures, selected based on project stage, complexity, and client preference:
- Percentage of Construction Cost (most common) — A fixed percentage of the total construction contract value, typically 3–6% depending on project scale and scope of services. For a $10M project, a 4% engagement represents $400,000 in fees — a figure we routinely offset in the first round of change-order audits and pay-application reviews.
- Fixed Fee — A lump-sum engagement for projects with clearly defined scope and duration, preferred by clients who want cost certainty on advisory services.
- Time and Materials with a Not-to-Exceed Cap — Suitable for engagements of limited or uncertain duration, such as mid-construction problem interventions, or preconstruction-only advisory services where construction is not yet under contract.
A Note on Results
We do not publish specific project outcomes or client names without permission. What we can state is that across the estate projects where we have served as owner's representative in the past five years, our clients have received independent verification of every dollar spent, a documented reduction in approved change-order amounts versus GC original proposals, and a closeout package that clearly assigns every warranty before the owner takes the keys. The value of independent expertise is not theoretical in this market — it is quantifiable on every project.
Engage EZ BH Projects as Your Owner's Representative
If you are planning a luxury construction project in Miami and want independent expertise working exclusively for you, contact EZ BH Projects. We offer an initial consultation to assess whether our engagement structure fits your project and your timeline.
Frequently Asked Questions
How much does an owner's representative cost for a luxury construction project in Miami?
Owner's representative fees for luxury residential construction in South Florida typically range from 3% to 6% of the total construction contract value. For a $10 million project, this represents $300,000 to $600,000 — a figure that experienced owner's reps routinely recover in cost savings through change-order audits, pay-application review, and GMP negotiation. Fixed-fee and time-and-materials structures are also available for projects at specific stages or with clearly bounded scope.
Is an owner's representative the same as a construction manager?
No. A construction manager at risk (CMR) takes on construction responsibility and holds a construction contract, creating a financial stake in the project's cost outcomes. An owner's representative has no contract with the GC, manages no subcontractors, and takes no construction risk. The owner's rep's sole obligation is to the owner — to provide independent oversight, audit the GC's representations, and advocate for the owner's interests throughout the project lifecycle.
Does hiring an owner's representative create a conflict of interest with my GC?
A well-structured owner's representative engagement does not create conflict — it creates clarity. The GC continues to manage the construction; the owner's rep reviews the GC's work on behalf of the owner. Experienced GCs who operate with integrity welcome owner's representatives because it reduces disputes: when an independent party has reviewed and approved a pay application or change order, the likelihood of contested payments is dramatically reduced. Our relationships with Miami-Dade's leading GCs are professional and productive.
What does an owner's representative do during pay-application review?
We review every monthly pay application before recommending payment. This includes verifying that the percentage-complete claimed for each line item in the schedule of values is consistent with observed field progress, confirming that stored-material claims are supported by documentation showing materials are on-site or in secured off-site storage, verifying that lien waivers from all subcontractors and suppliers are current, and confirming that retainage is being held at the contractually specified percentage.
How does an owner's representative audit change orders?
When a GC submits a change-order proposal, we perform an independent cost estimate using current Miami subcontractor market data before the owner approves any additional expenditure. We review labor rates, material quantities, and markup percentages against market benchmarks. We also review whether the changed condition was actually unforeseeable or whether it reflects a design omission that the GC's contract scope should have addressed. In our experience, change-order proposals submitted without independent review are routinely approved at 15–40% above what independent pricing supports.
Can an owner's representative be brought in mid-construction?
Yes — and it is often when an owner's rep is most urgently needed. If your project has experienced unexpected cost overruns, schedule slippage, quality disputes, or communication breakdowns, we can assess the situation rapidly: reviewing the contract, the payment history, the current schedule-of-values status, and the open issue log to give you an independent view of where the project stands and what options exist. Mid-construction engagements are typically structured on a time-and-materials basis.
What is GMP negotiation and how does an owner's rep help?
A Guaranteed Maximum Price (GMP) is a contract structure where the GC agrees to complete the project within a stated maximum cost. GMP negotiation — the process of establishing that ceiling before construction begins — is one of the highest-value points of intervention for an owner's representative. We review the GC's GMP proposal line by line, applying current market pricing to identify inflated allowances, excessive general conditions costs, and contingency levels above industry norms, typically reducing the initial GMP proposal by 3–8% before the contract is signed.
Does an owner's representative have fiduciary duty to the owner?
Yes — the owner's representative's engagement is structured as a fiduciary relationship with the owner. Unlike the GC, who is a contractual counterparty with its own financial interests, the owner's rep has no financial stake in construction cost outcomes and no relationship with any subcontractor on the project. Our fee does not change based on how much the project costs or how quickly it is completed. Our only incentive is to deliver the value our clients expect: independent expertise applied fully in their interest.
What does an owner's representative do for schedule management?
We establish a baseline construction schedule at the outset of construction and measure actual progress against it through regular site visits and contractor progress reports. When slippage occurs, we identify the critical-path impact — whether a two-week delay in one trade will cascade into a four-week delay in the following trade — and require the GC to submit a recovery schedule with specific mitigation measures before the delay compounds. Schedule recovery on a luxury project is almost always cheaper in its first week than in its third month.
How is punchlist enforcement handled by an owner's representative?
At substantial completion, we generate a comprehensive punchlist from an independent walk-through of the entire project — not from the GC's self-generated list. Each item is documented with description, location, and photograph. We track completion of every item through reinspection, and we do not recommend release of retainage until the punchlist is fully resolved and documented. The punchlist is the owner's last moment of significant leverage in the construction contract, and we treat it accordingly.
When is the right time to hire an owner's representative?
The ideal engagement begins during design development — before a GC is selected or a construction contract is signed. Early involvement allows the owner's rep to influence bid package quality, GC selection, contract terms, and preconstruction schedule alignment. However, an owner's rep can add substantial value at any stage: during GMP negotiation, at construction commencement, mid-construction, or even at closeout. Earlier is better, but it is never too late to introduce independent oversight to a project that needs it.